Builder Name:Jeff Seaborn   -  
Project:   Dalotel DM165   -   VIEW REPORTS
Total Hours:653
Total Flight Time:
Start/Last Date:Nov 06, 2019 - Nov 06, 2019
Engine:Originally Continental IO-346 A what? Yep, an IO-346 as used in Muskateers of the same vintage
Propeller:A Regy Wooden Fixed Pitch What the heck is that? A French prop from that era
Panel:Steam gauges circa 1969. In French and in metric. Yikes!
 
Friendly URL: https://eaabuilderslog.org?s=jseaborn

Home or Last Project Picture

Jul 20, 2020     Leading edges and skin support - (2 hours)       Category: Wings
Having picked up some bass wood last week, I was able to cut and plane to thickness some pieces for the leading edges and for skin support. This support is for the skin joint at the root section of the spar. I don't know how Dalotel originally joined the skins, but this support was shown in the drawings so I will take advantage of it to allow me to have a butt joint rather than a scarf joint in this area.


 